General Information
Completion: | 2018 |
---|---|
Duration of works: | 30 months |
Status: | under construction |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Box girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
The Gambia |
---|---|
Crosses: |
|
Coordinates: | 13° 31' 0.75" N 15° 34' 17.31" W |
Technical Information
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Structural engineering
-
Setec TPI
- Jean-Bernard Datry (structural engineer)
Relevant Web Sites
- About this
data sheet - Structure-ID
20074971 - Published on:
24/03/2018 - Last updated on:
24/03/2018