0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2018
Duration of works: 30 months
Status: under construction

Project Type

Location

Location:
Crosses:
  • Gambia
Coordinates: 13° 31' 0.75" N    15° 34' 17.31" W
Show coordinates on a map

Technical Information

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Structural engineering

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20074971
  • Published on:
    24/03/2018
  • Last updated on:
    24/03/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine