General Information
Name in local language: | Tunnel de la Galaure |
---|---|
Completion: | 1993 |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
High-speed rail tunnel |
Location
Location: |
Châteauneuf-de-Galaure, Drôme (26), Auvergne-Rhône-Alpes, France |
---|---|
Part of: |
|
Coordinates: | 45° 13' 38" N 4° 56' 30.40" E |
Coordinates: | 45° 15' 3.82" N 4° 57' 8.22" E |
Technical Information
Dimensions
total length | 3 088 m | |
tunnel length | 2 680 m | |
tunnel section area | 145 m² | |
depth | max. 80 m |
Quantities
concrete volume | 134 779 m³ | |
reinforcing steel | 3 075 t | |
excavated material | 400 000 m³ |
Cost
cost of construction | French Franc 593 700 000 |
Participants
Main contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Additif 2002 aux recommandations CLOUTERRE 1991. Pour la conception, le calcul, l'exécution et le contrôle des soutènements réalisés par clouage des sols. Presses de l'Ecole des Ponts et Chaussées, Paris (France), 2002, pp. 203.
- Prolongation de la ligne rapide TGV Paris/Sud-Est: Le tunnel de la Galaure. Presented at: AFTES - Journées techniques, Toulon , 1993, pp. 177-186. (1993):
- About this
data sheet - Structure-ID
20012811 - Published on:
06/08/2004 - Last updated on:
23/07/2014