General Information
Completion: | 2006 |
---|---|
Status: | in use |
Project Type
Structure: |
Girder bridge |
---|---|
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Location
Location: |
South Gyeongsang, South Korea |
---|
Technical Information
Dimensions
width | 20 m | |
length | 280 m | |
span lengths | 70 m - 50 m - 55 m - 35 m - 70 m | |
number of spans | 5 |
Materials
deck |
prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Jam buster. In: Bridge Design & Engineering, v. 12, n. 43 (2nd Quarter 2006), pp. 33. (2006):
- Une réalisation 100% Freyssinet. In: Sols et Structures, n. 222 (Second semester 2005), pp. 25.
- About this
data sheet - Structure-ID
20012280 - Published on:
15/02/2006 - Last updated on:
05/02/2016