General Information
Project Type
Structure: |
T-section girder bridge |
---|---|
Function / usage: |
Bicycle and pedestrian bridge |
Material: |
Prestressed concrete bridge Textile-reinforced concrete bridge |
Awards and Distinctions
2013 |
entry
for registered users |
---|
Location
Location: |
Albstadt, Zollernalbkreis, Baden-Württemberg, Germany |
---|---|
Coordinates: | 48° 12' 56.62" N 8° 57' 38.08" E |
Technical Information
Dimensions
total length | 97 m | |
span lengths | 16.125 m - 4 x 17.200 m - 11.825 m | |
number of spans | 6 | |
deck | width | 3.21 m |
girder depth | 0.435 m | |
precast elements (RC) | length | max. 17.20 m |
Materials
deck |
prestressed concrete
textile-reinforced concrete |
---|---|
columns |
steel tubes
|
Participants
Owner
Project management
Architecture
General contractor
Contractor
Textile supplier
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Schlanke Fußgängerbrücke aus Textilbeton. Sechsfeldrige Fußgängerbrücke mit einer Gesamtlänge von 97 m. In: Beton- und Stahlbetonbau, v. 106, n. 2 (February 2011), pp. 64-71. (2011):
- Schlanke vorgespannte Fußgängerbrücke aus Textilbeton. Presented at: 25. Dresdener Brückenbausysmposium, 9./10. März 2015, Dresden (Germany). (2015):
- (2010): A slender pedestrian bridge made of textile reinforced concrete. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 156-157.
- A Sustainable Footbridge Made of Textile-Reinforced Concrete. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- Tragverhalten und Dauerhaftigkeit einer schlanken Textilbetonbrücke. In: Beton- und Stahlbetonbau, v. 106, n. 2 (February 2011), pp. 72-80. (2011):
- About this
data sheet - Structure-ID
20058363 - Published on:
28/09/2010 - Last updated on:
03/11/2016