General Information
Project Type
Construction method: |
Incremental launching using match cast method |
---|---|
Structure: |
Single-cell box girder bridge |
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching with auxiliary supports |
Material: |
Prestressed concrete bridge |
Location
Location: |
Herning, Central Jutland, Denmark Silkeborg, Central Jutland, Denmark |
---|---|
Coordinates: | 56° 8' 22.89" N 9° 24' 18.09" E |
Technical Information
Dimensions
length | ca. 724 m | |
standard span lengths | 85 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Design
Alternative design
Structural engineering
Co-contractor
Relevant Web Sites
Relevant Publications
- (2010): Crossing the Funder Valley Using the Patented Match-Cast Incremental Launching Method. Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 274-275.
- Mit Match Cast über das Fundertal. Klothoide im Taktschiebeverfahren. In: Brückenbau, v. 3, n. 1 ( 2011), pp. 64-67. (2011):
- About this
data sheet - Structure-ID
20038576 - Published on:
30/07/2008 - Last updated on:
05/02/2016