General Information
Name in local language: | Fukushima Dai-Ni Genshiryoku Hatsudensho |
---|---|
Other name(s): | Fukushima Dai-Ni Genshiryoku Hatsudensho |
Completion: | 1982 |
Status: | damaged |
Project Type
Function / usage: |
Nuclear power plant |
---|
Location
Location: |
Naraha, Fukushima, Japan Tomioka, Fukushima, Japan |
---|---|
Coordinates: | 37° 18' 59" N 141° 1' 34" E |
Technical Information
Dimensions
Fukushima I – 1 | capacity for electric power generation | 460 MW |
Fukushima I – 2 | capacity for electric power generation | 784 MW |
Fukushima I – 3 | capacity for electric power generation | 784 MW |
Fukushima I – 4 | capacity for electric power generation | 784 MW |
Fukushima I – 5 | capacity for electric power generation | 784 MW |
Fukushima I – 6 | capacity for electric power generation | 1 100 MW |
Chronology
11 March 2011, 14:46 | During the 2011 Sendai earthquake, all for reactor units are automatically shut down. However, water temperature in the cooling systems of reactor units 1, 2 and 4 later reach 100 °C and pressure suppression funcitons are lost. |
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20059387 - Published on:
13/03/2011 - Last updated on:
11/07/2023