General Information
Completion: | September 2008 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Cable-stayed bridge with fan system |
Material: |
Timber bridge Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Hausach, Ortenaukreis, Baden-Württemberg, Germany |
---|---|
Crosses: |
|
Coordinates: | 48° 17' 18.53" N 8° 11' 17.11" E |
Technical Information
Dimensions
total length | 73.50 m | |
span lengths | 22.50 m - 32.50 m - 10 m | |
number of spans | 3 |
Cost
cost of construction | Euro 320 000 |
Materials
pylon |
steel
|
---|---|
deck |
glued laminated timber (glulam)
|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
cross beams |
steel
|
Participants
Owner
Structural engineering
Checking engineering
- Erich Milbrandt (checking engineer)
Timber construction
Relevant Web Sites
- About this
data sheet - Structure-ID
20078640 - Published on:
15/10/2019 - Last updated on:
15/10/2019