General Information
Other name(s): | Theodor-Heuss-Brücke |
---|---|
Completion: | 1949 |
Status: | demolished (1990) |
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Reinforced concrete bridge |
Location
Location: |
Heidelberg, Baden-Württemberg, Germany |
---|---|
Crosses: |
|
Replaces: |
Friedrichsbrücke (1877)
|
Replaced by: |
Theodor Heuss Bridge (1992)
|
Technical Information
Dimensions
span lengths | 5 x 38.50 m - 28.35 m | |
number of spans | 6 | |
deck | deck depth | 2.25 m |
Materials
superstructure |
reinforced concrete
|
---|
Chronology
1964 | Renamed Theodor-Heuss-Brücke. |
---|
Participants
Owner
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ingenieurbauführer Baden-Württemberg. 1st edition, Bauwerk Verlag, Berlin (Germany), pp. 84-85. (1999):
- About this
data sheet - Structure-ID
20001530 - Published on:
14/07/2001 - Last updated on:
05/02/2016