0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Oderbrücke Frankfurt
Beginning of works: April 1993
Completion: 4 December 1997
Duration of works: 66 months
Status: in use

Project Type

Location

Location: , ,
, ,
Crosses:
  • Oder/Odra River
Part of:
Next to: Frankfurt Motorway Bridge (1957)
Coordinates: 52° 18' 55.76" N    14° 34' 39.75" E
Show coordinates on a map

Technical Information

Dimensions

main span 82.30 m
total length 581.22 m
span lengths 53.40 m - 55.80 m - 60.50 m - 68.00 m - 82.30 m - 68.00 m - 62.00 m
number of spans 7
bridge surface 8 782.20 m²
number of lanes 2
roadway / carriageway width 11.50 m
abutments number 2
deck deck width 15.25 m
number of longitudinal girders 2

Quantities

formwork 25 000 m²
abutment concrete volume 1 590 m²
reinforcing steel 192 t
arches concrete volume 5 377 m²
reinforcing steel 590 t
deck concrete volume 4 530 m²
reinforcing steel 779 t
parapets concrete volume 552 m²
reinforcing steel 75 t
piers concrete volume 1 635 m²
reinforcing steel 150 t

Cost

cost of construction German Mark 88 000 000

Materials

deck reinforced concrete (B 45)
piers reinforced concrete (B 35)
parapets reinforced concrete (B 25)
arches reinforced concrete (B 35)
abutments reinforced concrete (B 25)

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000410
  • Published on:
    16/09/1999
  • Last updated on:
    15/06/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine