General Information
Project Type
Structure: |
Multiple T-section girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Location
Technical Information
Dimensions
length of ramp bridges | 185 m | |
span lengths of main bridge | 37.48 m - 2 x 29.16 m - 33.79 m - 49.40 m | |
span lengths of ramp bridges | 20.70 m - 20.50 m - 39.75 m / 42.26 m - 2 x 20.50 m - 20.70 m | |
deck | deck width | 20 m / 6 m |
main bridge | ||
---|---|---|
length | 179 m |
Cost
cost of construction | German Mark 26 350 000 | |
cost of construction per m² | German Mark 5728 |
Materials
substructure |
reinforced concrete
|
---|---|
deck |
prestressed concrete
|
Notes
The ramp bridges are slab bridges.
Participants
Owner
Client
Structural engineering
- Bilfinger Berger SE (superstructure)
- Köhler + Seitz Beraten und Planen GmbH (substructure)
- Alfred Krill (structural engineer) (superstructure)
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken der Bundesfernstraßen 1995. Verkehrsblatt-Verlag, Dortmund (Germany), 1995, pp. 61-70.
- About this
data sheet - Structure-ID
20001151 - Published on:
08/12/2000 - Last updated on:
05/02/2016