General Information
Other name(s): | Tunnel de Fourvière |
---|---|
Completion: | 8 December 1971 |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Lyon, Rhône (69), Auvergne-Rhône-Alpes, France |
---|---|
For: |
|
Part of: | |
Next to: |
Pôle d'échanges de Lyon-Perrache (1976)
|
Coordinates: | 45° 45' 8" N 4° 49' 13" E |
Coordinates: | 45° 45' 48" N 4° 48' 11" E |
Technical Information
Dimensions
tunnel length | 1 853 m | |
number of lanes | 2 x 2 | |
number of tubes | 2 |
Participants
LED-type marker-lighting
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- La dalle de chaussée du tunnel sous Fourvière. In: Travaux, n. 454 (January 1973), pp. 64. (1973):
- La rénovation du tunnel sous Fourvière. Les travaux du génie civil et du gros oeuvre. In: Travaux, n. 744 (July - August 1998), pp. 65-68. (1998):
- Le tunnel routier sous Fourvières à Lyon. In: Travaux ( 1970), pp. 53. (1970):
- About this
data sheet - Structure-ID
20007941 - Published on:
31/01/2003 - Last updated on:
28/05/2021