General Information
Other name(s): | Fourth Ebro River Bridge |
---|---|
Completion: | 2003 |
Status: | in use |
Project Type
Structure: |
Through arch bridge |
---|---|
Function / usage: |
Road bridge Pedestrian bridge (footbridge) |
Material: |
Steel bridge |
Location
Technical Information
Dimensions
main span | 140 m |
Materials
arch |
steel
|
---|
Participants
Design
- Carlos Fernández Casado S.L.
- Javier Manterola (designer)
- Miguel Ángel Gil (designer)
Structural engineering
Co-contractor
Stay cables
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Freyssinet cable-stayed structures. Freyssinet International, Vélizy-Villacoublay (France), 2004, pp. 61.
- About this
data sheet - Structure-ID
20012087 - Published on:
14/05/2004 - Last updated on:
01/09/2016