0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Forchach Suspension Bridge

General Information

Name in local language: Hängebrücke Forchach
Beginning of works: April 2020
Completion: 14 August 2020
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Lech River
Coordinates: 47° 25' 31.20" N    10° 34' 53.45" E
Show coordinates on a map

Technical Information

Dimensions

main span 138 m
longitudinal slope 8%
cables length 166 m
number 2

Cost

cost of construction Euro 760 000

Materials

pylon steel
deck steel
abutments reinforced concrete

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20081162
  • Published on:
    07/07/2021
  • Last updated on:
    07/07/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine