General Information
Completion: | 2005 |
---|---|
Duration of works: | 1.5 months |
Status: | in use |
Project Type
Structure: |
Single-span two-tower suspension bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 54 m | |
span | 41 m | |
cables | diameter | 22 mm |
sag | 5 m | |
deck | width | 1.5 m |
pylons | height | 6 m |
height | 10 m | |
suspenders | diameter | 12 mm |
Cost
cost of construction | Euro 12 100 |
Materials
cables |
steel wire
|
---|---|
foundations |
reinforced concrete
|
pylons |
steel
|
anchorages |
reinforced concrete
|
deck flooring |
wood
|
Chronology
December 2005 | Completion. |
---|