General Information
Name in local language: | Folke Bernadottes bro |
---|---|
Completion: | 17 December 2019 |
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
Deck truss bridge |
Support conditions: |
for registered users |
Location
Location: |
Stockholm, Stockholms län, Sweden |
---|---|
Coordinates: | 59° 19' 50.26" N 18° 7' 10.44" E |
Technical Information
Dimensions
main span | 78 m | |
span lengths | 9.5 m - 78 m - 8.5 m | |
number of spans | 3 |
Materials
truss |
steel tubes
|
---|
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2022): A Simplified Dynamic Analysis of Existing Pedestrian Bridges, a Possibility to get new Experience for Designing. Presented at: Footbridge 2022: Creating Experience, Madrid, Spain, 07-09 September 2022.
- About this
data sheet - Structure-ID
20083958 - Published on:
28/10/2022 - Last updated on:
29/10/2022