0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): FIU 8th Street Pedestrian Bridge; UniversityCity Bridge
Beginning of works: March 2016
Completion: December 2018
Status: collapsed (15 March 2018)

Project Type

Location

Location: , , ,
Coordinates: 25° 45' 40.31" N    80° 22' 22.36" W
Show coordinates on a map

Technical Information

Dimensions

main span 53 m
total length 98 m
number of spans 2
pier number 1
pylon height 33 m
number 1

Cost

cost of construction United States dollar 14 200 000

Materials

pylon reinforced concrete
deck prestressed concrete
piers reinforced concrete
truss prestressed concrete

Chronology

10 March 2018

The primary bridge structure is moved from the assembly site parallel to the road to its final position across SW 8th Street

15 March 2018

For yet unknown reasons, the still unfinished bridge collapses onto SW 8th Street on top of several vehicles. Several people are injured or killed.

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20074877
  • Published on:
    15/03/2018
  • Last updated on:
    29/09/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine