General Information
Completion: | 2011 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Museum building |
---|---|
Structure: |
Portal frame |
Material: |
Steel structure |
Location
Location: |
Colchester, Essex, East of England, England, United Kingdom |
---|---|
Coordinates: | 51° 53' 19.52" N 0° 54' 21.41" E |
Technical Information
Dimensions
length | 200 m | |
gross floor area | 3 800 m² | |
auditorium | seats | 190 |
Cost
cost of construction | Pound sterling 28 000 000 |
Case Studies and Applied Products
TECU® Gold
TECU® Gold is a new material with a precious golden surface for impressive new façade solutions using copper.
[more]Participants
Owner
Architecture
-
Rafael Viñoly Architects
- Rafael Viñoly (architect)
Structural engineering
Material supplier
Mechanical & electrical engineering
Relevant Web Sites
- About this
data sheet - Structure-ID
20085376 - Published on:
15/02/2023 - Last updated on:
16/02/2023