General Information
Completion: | 2008 |
---|---|
Status: | in use |
Project Type
Structure: |
T-section girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Prestressed concrete bridge |
Location
Location: |
Atlanta, Fulton County, Georgia, USA |
---|---|
Address: | Fifth Street |
Coordinates: | 33° 46' 36.74" N 84° 23' 27.16" W |
Technical Information
Cost
cost of construction | United States dollar 10 120 000 |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
precast prestressed concrete
|
Participants
Design
Architecture
Contractor
Precastor
Subcontractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Fifth Street Pedestrian Plaza Bridge. In: ASPIRE (Winter 2008). (2008):
- About this
data sheet - Structure-ID
20039031 - Published on:
13/08/2008 - Last updated on:
05/02/2016