0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 18 June 1997
Status: in use

Project Type

Location

Location: , ,
Coordinates: 55° 29' 59.61" N    9° 30' 34.83" E
Show coordinates on a map

Technical Information

Dimensions

total length 40 m
span lengths 27 m - 13 m
number of spans 2
weight 12 t
girder depth 1.5 m
total width 3.2 m
pylon height 18.5 m
stay cables number of cables 8

Design Loads

live load 500 kg/m² / 5 t

Materials

pylon glass-fiber-reinforced polymer (GFRP)
deck glass-fiber-reinforced polymer (GFRP)

Notes

Erection of the bridge took 18 hours.

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20004910
  • Published on:
    08/09/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine