General Information
Name in local language: | Schloss-Fernstein-Brücke |
---|---|
Completion: | 1856 |
Status: | in use |
Project Type
Structure: |
Vaulted arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Masonry bridge |
Location
Location: |
Nassereith, Tyrol, Austria |
---|---|
Coordinates: | 47° 20' 42.86" N 10° 49' 8.43" E |
Technical Information
Dimensions
width | 7 m | |
height above valley floor or water | 12 m |
Materials
arches |
stone
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20018517 - Published on:
15/11/2005 - Last updated on:
05/02/2016