General Information
| Name in local language: | Feld- und Waldwegüberführung Feldmoching |
|---|---|
| Beginning of works: | 1991 |
| Completion: | 1992 |
| Duration of works: | 9 months |
| Status: | in use |
Project Type
| Structure: |
Rigid frame bridge |
|---|---|
| Function / usage: |
Road bridge |
| Material: |
Prestressed concrete bridge |
Location
| Location: |
Feldmoching, Feldmoching-Hasenbergl, Munich, Bavaria, Germany |
|---|---|
| Crosses: |
A 99 Motorway (Germany)
|
| Coordinates: | 48° 12' 46.10" N 11° 29' 57.34" E |
Technical Information
Dimensions
| main span | 59.50 m | |
| bridge surface | 403 m² | |
| deck | deck width | 5.86 m |
Quantities
| prestressing steel | 18 t | |
| reinforcing steel | 105 t | |
| substructure | concrete volume | 865 m³ |
| superstructure | concrete volume | 483 m³ |
Design Loads
| live load | Brückenklasse 30/30 | |
| design code(s) | DIN 1072 |
Cost
| cost of construction | German Mark 1 441 000 | |
| cost of construction per m² | German Mark 3575 |
Materials
| superstructure |
prestressed concrete
|
|---|---|
| substructure |
reinforced concrete
|
Participants
Owner
Client
Original design
Architecture
Erection engineering
Soil investigation report
Checking engineering
- D. Müller (checking engineer)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken der Bundesfernstraßen 1995. Verkehrsblatt-Verlag, Dortmund (Germany), 1995, pp. 109-118.
- About this
data sheet - Structure-ID
20001155 - Published on:
09/12/2000 - Last updated on:
07/12/2016



