0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Feld- und Waldwegüberführung Feldmoching
Beginning of works: 1991
Completion: 1992
Duration of works: 9 months
Status: in use

Project Type

Structure: Rigid frame bridge
Function / usage: Road bridge
Material: Prestressed concrete bridge

Location

Location: , , , ,
Crosses: A 99 Motorway (Germany)
Coordinates: 48° 12' 46.10" N    11° 29' 57.34" E
Show coordinates on a map

Technical Information

Dimensions

main span 59.50 m
bridge surface 403 m²
deck deck width 5.86 m

Quantities

prestressing steel 18 t
reinforcing steel 105 t
substructure concrete volume 865 m³
superstructure concrete volume 483 m³

Design Loads

live load Brückenklasse 30/30
design code(s) DIN 1072

Cost

cost of construction German Mark 1 441 000
cost of construction per m² German Mark 3575

Materials

superstructure prestressed concrete
substructure reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001155
  • Published on:
    09/12/2000
  • Last updated on:
    07/12/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine