General Information
Project Type
Function / usage: |
Road tunnel |
---|---|
Structure: |
Tunnel |
Location
Location: |
Mannheim, Baden-Württemberg, Germany |
---|---|
Address: | B 37 / B38a |
Coordinates: | 49° 28' 20.40" N 8° 28' 49.95" E |
Coordinates: | 49° 28' 16.08" N 8° 29' 13.44" E |
Technical Information
Dimensions
total length | 489 m | |
number of tubes | 2 | |
tube | interior width | max. 10.15 m |
interior height | max. 7.4 m |
Cost
cost of construction | ca. Euro 80 000 000 |
Participants
Consulting engineers
Co-contractor
Project controlling
Relevant Web Sites
- About this
data sheet - Structure-ID
20044448 - Published on:
09/03/2009 - Last updated on:
24/07/2014