General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Kaiserslautern, Rhineland-Palatinate, Germany Sembach, Kaiserslautern (Kreis), Rhineland-Palatinate, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 49° 27' 44.14" N 7° 48' 40.56" E |
Technical Information
Dimensions
main span | 100.00 m | |
deck depth | 3.00 - 5.50 m | |
total length | 235.00 m | |
span lengths | 65 m - 100 m - 70 m | |
deck width | 29.50 m | |
number of spans | 3 |
Quantities
substructure | concrete volume | 4 527 m³ |
reinforcing steel | 580 t | |
superstructure | concrete volume | 6 350 m³ |
reinforcing steel | 920 t | |
internal prestressing | 168 t | |
external prestressing | 97 t |
Cost
cost of construction | Euro 9 200 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Alternative design
Structural engineering
Checking engineering
- Tilman Zichner (checking engineer)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20014495 - Published on:
20/11/2004 - Last updated on:
28/01/2018