General Information
Project Type
Structure: |
Arch dam |
---|---|
Function / usage: |
Hydroelectric dam / plant |
Material: |
Concrete dam |
Location
Technical Information
Dimensions
height | 218 m | |
retained water volume | 4 582 000 000 m³ | |
crest length | 132 m | |
crest thickness | 7 m | |
base thickness | 25 m | |
capacity for electric power generation | 306 MW | |
dam volume | 290 000 m³ | |
water surface area | 58.74 km² | |
annual power generation | 1047.8 GWh |
Materials
dam structure |
concrete
|
---|
Participants
Structural engineering
Relevant Web Sites
Relevant Publications
- Analysis of Displacement Response of the Ermenek Dam Monitored by an Integrated Geodetic and Pendulum System. In: International Journal of Civil Engineering, v. 16, n. 10 (February 2018), pp. 1279-1291. (2018):
- Design and construction of the grout curtain for the Ermenek hydropower plant / Planung und Ausführung des Dichtschirms für das Wasserkraftwerk Ermenek. In: Geomechanics and Tunnelling, v. 2, n. 5 ( 2009), pp. 421-429. (2009):
- Ermenek Dam and Hydro Electric Power Plant (HEPP) Project. In: Felsbau, v. 23, n. 2 ( 2005), pp. 52. (2005):
- Ermenek HPP - groundwater table development during impounding. In: Geomechanics and Tunnelling, v. 3, n. 5 ( 2010), pp. 470-479. (2010):
- Excavation of the Ermenek Headrace Tunnel with an Open Type Hard Rock TBM. In: Felsbau, v. 23, n. 6 ( 2005), pp. 15. (2005):
- About this
data sheet - Structure-ID
20059155 - Published on:
08/12/2010 - Last updated on:
25/07/2014