General Information
Completion: | 2022 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Deck arch bridge |
Material: |
Steel bridge |
Construction method: |
Structurae Plus/Pro - Subscribe Now! |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
Two-hinged arch bridge |
Location
Location: |
Vienna 2 (Leopoldstadt), Vienna, Austria Vienna 3 (Landstrasse), Vienna, Austria |
---|---|
Crosses: |
|
Coordinates: | 48° 12' 9" N 16° 24' 8" E |
Technical Information
Dimensions
total length | 85.3 m |
Materials
deck |
steel
|
---|---|
arches |
steel
|
abutments |
reinforced concrete
|
piers on arch |
steel
|
Participants
Owner
Design
- Hollinsky & Partner Ziviltechnikergesellschaft m.b.H.
-
tragwerkstatt Ziviltechniker gmbh
- Rudolf Brandstötter (designer)
Traffic engineering
Checking engineering
- Herbert Pommer (checking engineer)
Contractor
Coordination
Relevant Web Sites
Relevant Publications
- Brücken in Wien. Ein Führer durch die Baugeschichte. Springer, Vienna (Austria), pp. 128-129. (2005):
- »Erdberger Steg 2.0«. Geh- und Radwegbrücke über den Donaukanal in Wien. In: Brückenbau, v. 15, n. 1-2 ( 2023), pp. 14-21. (2023):
- About this
data sheet - Structure-ID
20087709 - Published on:
29/12/2023 - Last updated on:
29/12/2023