0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1969
Completion: 1971
Status: demolished (2015)

Project Type

Location

Location: , ,
, ,
Crossed:
  • Danube Canal
Replaced by: Erdberger Brücke (2016)
Coordinates: 48° 11' 34.72" N    16° 24' 59" E
Show coordinates on a map

Technical Information

Dimensions

total length 147.0 m
span lengths 34.5 m - 73.0 m - 34.5 m
number of spans 3
total width 42.5 m

Materials

shell reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20058383
  • Published on:
    29/09/2010
  • Last updated on:
    30/10/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine