General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Leonberg (Württemberg), Böblingen (Kreis), Baden-Württemberg, Germany |
---|---|
Part of: | |
Coordinates: | 48° 48' 12.65" N 9° 2' 17.70" E |
Coordinates: | 48° 47' 10.38" N 9° 0' 58.56" E |
Technical Information
Dimensions
length | 2 x 2 530 m | |
clear interior profile | 13.50 x 4.70 m |
Quantities
concrete volume | 255 00 m³ |
Cost
cost of construction | German Mark 604 000 000 |
Materials
tunnel structure |
reinforced concrete
|
---|
Chronology
25 July 1995 | Construction begins |
---|---|
11 September 1998 | Opening of the eastern tube |
12 August 1999 | Opening of the western tube |
Participants
Owner
Client
Structural engineering
Checking engineering
- Ingenieurgruppe Bauen
- Müller + Hereth
- Klaus Stiglat (checking engineer)
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Der Bau des Engelberg-Basistunnels hat begonnen. In: Beton- und Stahlbetonbau, v. 91, n. 10 (October 1996), pp. 241-242.
- Brücken und Tunnel der Bundesfernstraßen 2000. Verkehrsblatt-Verlag, Dortmund (Germany), 2000, pp. 117-130.
- Erfahrungen beim Bau des Sondierstollens Engelberg. In: Beton- und Stahlbetonbau, v. 74, n. 12 (December 1979), pp. 289-293. (1979):
- Ingenieurbauführer Baden-Württemberg. 1st edition, Bauwerk Verlag, Berlin (Germany), pp. 242-246. (1999):
- About this
data sheet - Structure-ID
20000673 - Published on:
11/04/2000 - Last updated on:
28/05/2021