0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1995
Completion: 12 August 1999
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , , ,
Part of:
Coordinates: 48° 48' 12.65" N    9° 2' 17.70" E
Coordinates: 48° 47' 10.38" N    9° 0' 58.56" E
Show coordinates on a map

Technical Information

Dimensions

length 2 x 2 530 m
clear interior profile 13.50 x 4.70 m

Quantities

concrete volume 255 00 m³

Cost

cost of construction German Mark 604 000 000

Materials

tunnel structure reinforced concrete

Chronology

25 July 1995

Construction begins

11 September 1998

Opening of the eastern tube

12 August 1999

Opening of the western tube

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000673
  • Published on:
    11/04/2000
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine