General Information
Completion: | 2004 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Pedestrian bridge (footbridge) |
---|---|
Structure: |
Rigid frame bridge |
Material: |
Reinforced concrete bridge |
Location
Location: |
Schwabing-Freimann, Munich, Bavaria, Germany Bogenhausen, Munich, Bavaria, Germany |
---|---|
Replaces: |
Emmeramssteg
|
Coordinates: | 48° 10' 34.49" N 11° 37' 33.95" E |
Technical Information
Dimensions
bridge surface | 85 m² |
Materials
deck slab |
reinforced concrete
|
---|---|
portal legs |
steel
|
Participants
Design
Structural engineering
Checking engineering
- Konrad Doblies (checking engineer)
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Moderne Interpretation. Zwei Fußgängerbrücken im Münchener Norden. In: [ Umrisse ], v. 4, n. 1 ( 2004), pp. 18-21. (2004):
- About this
data sheet - Structure-ID
20011871 - Published on:
21/04/2004 - Last updated on:
05/02/2016