0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Mainbrücke Eltmann
Beginning of works: 2004
Completion: 2006
Status: in use

Project Type

Function / usage: Motorway bridge / freeway bridge
Structure: Haunched girder bridge
Material: Prestressed concrete bridge
Structure: main bridge:
Box girder bridge
Construction method: main bridge:
Balanced cantilever method
Material: Structurae Plus/Pro - Subscribe Now!
Structure: approach viaduct:
T-section girder bridge
Construction method: approach viaduct:
Movable Scaffolding System

Location

Location: , , ,
Crosses:
  • Main River
Carries:
  • Autobahn A70
Part of:
Next to: Eltmann Bridge (1987)
Coordinates: 49° 58' 38.62" N    10° 38' 54.10" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 055 m
bridge surface 14 500 m²
total width 14.288 m
deck roadway / carriageway width 11.50 m
piers height 8 - 10 m
approach viaduct
deck depth 2.20 m
span lengths 10 x 40.405 m - 40.005 m - 38.393 m
deck width 13.775 m
number of spans 12
deck slab thickness 22 - 52 cm
main bridge
deck depth 3.80 - 7.50 m
span lengths 72.661 m - 98.509 m - 147.09 m - 150.00 m - 104.192 m
number of spans 5
web thickness 0.45 - 0.60 m

Quantities

deck concrete volume 12 200 m³
prestressing steel 640 t

Cost

cost of construction ca. Euro 18 000 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20025840
  • Published on:
    06/01/2007
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine