General Information
Name in local language: | Hochstraßenbrücke Elbmarsch |
---|---|
Beginning of works: | 1971 |
Completion: | 1974 |
Status: | in use |
Project Type
Structure: |
Quadruple T-section girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Hamburg-Finkenwerder, Hamburg, Germany Hamburg-Moorburg, Hamburg, Germany Hamburg-Steinwerder, Hamburg, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 53° 31' 23.16" N 9° 55' 39.84" E |
Technical Information
Dimensions
Initial construction | ||
---|---|---|
total length | 4 359 m | |
standard span lengths | 35 m | |
deck | deck depth | 2.10 m |
deck width | 2 x 17.75 m |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
precast prestressed concrete
|
Participants
Initial construction (1971-1974)
Owner
Client
Widening (2019-2027)
Owner
Client
Design
- BUNG Ingenieure AG
- Ingenieurbüro Grassl GmbH Beratende Ingenieure Bauwesen
- Schüßler-Plan Ingenieurgesellschaft mbH
Structural engineering
Co-contractor
- Ed. Züblin AG (Lot 3.1)
- Fr. Holst GmbH & Co. KG (Lot 3.2)
- HOCHTIEF Infrastructure GmbH (Lot 3.2)
- Johann Bunte Bauunternehmung GmbH & Co. (Lot 3.1)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken / Bridges. Ästhetik und Gestaltung / Aesthetics and Design. 4th edition, Deutsche Verlags-Anstalt, Stuttgart (Germany), pp. 132-133. (1994):
- Die Hochstraße Elbmarsch im Zuge der Bundesautobahn "Westliche Umgehung Hamburg". In: Bauingenieur, v. 48, n. 7 (July 1973), pp. 201-211. (1973):
- Verbreiterung der Hochstraße Elbmarsch in Hamburg. Koppeln von Alt und Neu. In: Brückenbau, v. 12, n. 1-2 ( 2020), pp. 38-43. (2020):
- About this
data sheet - Structure-ID
20004993 - Published on:
15/09/2002 - Last updated on:
24/06/2020