General Information

Name in local language: Talbrücke Elben
Beginning of works: March 2003
Completion: June 2005
Duration of works: 28 months
Status: in use

Project Type

Location

Location: , , ,
Carries:
  • Autobahn A4
Part of:
Coordinates: 50° 59' 41.15" N    7° 53' 34.75" E
Show coordinates on a map

Technical Information

Dimensions

total length 431 m
span lengths 40 m - 60 m - 70 m - 80 m - 70 m - 62 m - 50 m
number of spans 7
horizontal radius of curvature 1 580 m
bridge surface 12 312 m³
height above valley floor or water 53 m
deck deck width 28.50 m

Quantities

abutments concrete volume 1 400 m³
reinforcing steel 97 t
foundations concrete volume 1 240 m³
reinforcing steel 200 t
piers concrete volume 3 200 m³
reinforcing steel 376 t
superstructure structural steel 2 950 t
concrete volume 4 545 m³
reinforcing steel 870 t

Cost

cost of construction Euro 14 800 000

Materials

piers reinforced concrete
girder steel
deck slab reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20014494
  • Published on:
    20/11/2004
  • Last updated on:
    22/10/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine