0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1996
Completion: 2001
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Motorway bridge / freeway bridge

Location

Location: ,
Crosses:
  • Nile
Coordinates: 30° 8' 0.77" N    31° 12' 13.33" E
Show coordinates on a map

Technical Information

Dimensions

main span ca. 120 m
total length 2.25 km
main bridge
length 1 200 m

Cost

cost of construction United States dollar 65 000 000

Participants

Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Greeman, Adrian (1999): Cairo crossing. In: Bridge Design & Engineering, v. 5, n. 17 (4th Quarter 1999), pp. 59.
  • About this
    data sheet
  • Structure-ID
    20005879
  • Published on:
    03/10/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine