General Information
Name in local language: | Puente El Samán |
---|---|
Completion: | 2015 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
main span: Unbraced tied-arch bridge |
Material: |
main span: Steel bridge |
Construction method: |
main span: Longitudinal launching main span: Lateral / transverse launching |
Structure: |
secondary span: T-section girder bridge |
Material: |
secondary span: Prestressed concrete bridge |
Construction method: |
secondary span: Precast girders with cast-in-situ slab |
Location
Location: |
Miranda, Venezuela |
---|---|
Location description: |
Crosses río Tuy |
Coordinates: | 10° 12' 44.86" N 66° 8' 58.58" W |
Technical Information
Dimensions
main span | 56 m | |
total length | 75.20 m | |
span lengths | 56 m - 19.20 m | |
number of spans | 2 | |
bridge surface | 820.2 m² | |
main span | ||
---|---|---|
arches | rise | 6.60 m |
deck | deck width | 11.56 m |
secondary span | ||
deck | deck width | 9 m |
on-center distance between girders | 2.20 m | |
deck slab thickness | 0.20 m | |
girder depth | 1.20 m |
Quantities
superstructure | ||
---|---|---|
structural steel | 330.4 t | |
concrete volume | 199.9 m³ | |
reinforcing steel | 37.1 t |
Materials
arches |
steel
|
---|---|
deck of approach viaduct |
prestressed concrete
|
abutments |
reinforced concrete
|
pier |
reinforced concrete
|
Participants
Owner
Design
-
Diseño y Construcciones Integrados C.A.
- Luis B. Fargier-Gabaldon (designer)
- Edgar Chacon (designer)
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20078888 - Published on:
15/12/2019 - Last updated on:
15/12/2019