0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1963
Status: destroyed (1967)

Project Type

Location

Location: ,
Crossed:
  • Suez Canal
Part of:
Replaces: El Ferdan Bridge (1954)
Replaced by: El Ferdan Swing Bridge (2001)

Technical Information

Dimensions

main span 167.50 m
total length 317.40 m
span lengths 74.95 m - 167.50 m - 74.95 m
number of spans 3
truss depth max. 24.000 m

Materials

truss steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20010806
  • Published on:
    01/12/2003
  • Last updated on:
    23/10/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine