General Information
Completion: | 2000 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Deck arch bridge |
Material: |
Reinforced concrete bridge Structurae Plus/Pro - Subscribe Now! |
Construction method: |
arch: Cantilever construction using temporary cable-stays |
Location
Location: |
El Tiemblo, Ávila, Castile-Leon, Spain |
---|---|
Near: |
El Burguillo Dam (1913)
|
Coordinates: | 40° 25' 41.23" N 4° 32' 20.69" W |
Technical Information
Dimensions
arch | width | 4.00 m |
rise | 22.00 m | |
arch span | 165 m | |
depth | 1.75 - 3.10 m | |
deck | deck depth | 0.90 m |
deck width | 12.00 m |
Quantities
arch | concrete volume | 1 607.81 m³ |
reinforcing steel | 195.074 t | |
deck | concrete volume | 1 974.94 m³ |
prestressing steel | 22.385 t | |
reinforcing steel | 290.883 t | |
foundations | concrete volume | 1 609.26 m³ |
reinforcing steel | 109.430 t | |
supports | concrete volume | 480.77 m³ |
reinforcing steel | 61.917 t | |
temporary works | steel for cable-stays | 56.410 t |
Cost
cost of construction per m² | Euro 750 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
arch |
reinforced concrete
|
abutments |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Puente arco sobre el embalse de El Burguillo (Ávila) diseño y control de la ejecución. In: Hormigón y acero, v. 52, n. 220 (2nd Quarter 2001), pp. 3-17. (2001):
- About this
data sheet - Structure-ID
20076253 - Published on:
30/10/2018 - Last updated on:
30/10/2018