General Information
Name in local language: | Pont Edouard-Daladier |
---|---|
Beginning of works: | August 1955 |
Completion: | 21 June 1961 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
main bridge: Box girder bridge |
Material: |
main bridge: Prestressed concrete bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! approach viaducts: Concrete bridge |
Structure: |
approach viaducts: Elliptical arch bridge |
Location
Location: |
Avignon, Vaucluse (84), Provence-Alpes-Côte d'Azur, France |
---|---|
Crosses: |
|
Coordinates: | 43° 57' 5.03" N 4° 48' 0.87" E |
Technical Information
Dimensions
total length | 236 m | |
number of lanes | 2 + 1 | |
roadway / carriageway width | 9 m | |
cycleway width | 2.60 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
arches |
un-reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
- About this
data sheet - Structure-ID
20011571 - Published on:
13/03/2004 - Last updated on:
08/06/2017