General Information
Completion: | 1919 |
---|---|
Status: | in use |
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Reinforced concrete bridge |
Structure: |
Two-hinged arch bridge |
Location
Location: |
Otago, New Zealand |
---|---|
Location description: |
Crosses Shotover River at Arthurs Point in Otago. |
Coordinates: | 44° 59' 17.93" S 168° 40' 18.85" E |
Technical Information
Dimensions
span | 30.5 m |
Materials
arch |
reinforced concrete
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridging the Gap. Early Bridges in New Zealand 1830-1939. Reed Books, Auckland (New Zealand), pp. 264. (2001):
- About this
data sheet - Structure-ID
20052110 - Published on:
15/01/2010 - Last updated on:
08/06/2017