• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Eching Tunnel

General Information

Name in local language: Tunnel Eching
Beginning of works: 1993
Completion: 1995
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: Cut-and-cover method

Location

Location: , , ,
For:
  • Autobahn A96
Part of:
Coordinates: 48° 4' 40.05" N    11° 7' 3.15" E
Coordinates: 48° 4' 36.38" N    11° 6' 43.76" E
Show coordinates on a map

Technical Information

Dimensions

number of lanes 2 x 2
number of tubes 2
superelevation 2.5 %
Eastern trough length 146 m
tunnel width 24.60 m
length 413 m
clear interior profile 2 × 11.50 m × 4.80 m
Western trough length 197 m

Cost

cost of construction German Mark 37 700 000

Materials

tunnel structure reinforced concrete

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001178
  • Date created
    17/12/2000
  • Last Update
    22/07/2014