General Information
Completion: | 2007 |
---|---|
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
High-speed rail tunnel |
Location
Location: |
Swanscombe, Dartford, Kent, South East England, England, United Kingdom Thurrock, Essex, East of England, England, United Kingdom |
---|---|
Underneath of: |
|
Part of: | |
Coordinates: | 51° 27' 12.72" N 0° 18' 37.65" E |
Coordinates: | 51° 28' 9.21" N 0° 16' 26.34" E |
Technical Information
Dimensions
diameter | 2 x 7.15 m | |
tunnel length | 2 x 2 500 m |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bored tunnels. In: The Arup Journal, v. 39, n. 1 ( 2004), pp. 22-28. (2004):
- Channel Tunnel Rail Link section 2: Thames tunnel. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 160, n. 6 (November 2007), pp. 14-18. (2007):
- Le chantier du Channel Tunnel Rail Link (CTRL). Les entreprises françaises à l'international. In: Tunnels et Ouvrages Souterrains, n. 170 (March - April 2002), pp. 69-72. (2002):
- About this
data sheet - Structure-ID
20003498 - Published on:
09/06/2002 - Last updated on:
22/07/2014