0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Status: collapsed (27 August 2016)

Project Type

Location

Location: , , , ,
Coordinates: 51° 18' 31.94" N    0° 22' 47.97" E
Show coordinates on a map

Technical Information

Materials

superstructure prestressed concrete
piers reinforced concrete

Chronology

27 August 2016

A lorry - or the cargo loaded onto it - hits the superstructure of the footbridge. The impact moves the section supported on bearings off the pier which then collapses onto the southern carriageway. The balanced cantilever section which spans nearly the entire other carriageway remains unscathed and stable The accident causes no serious injury.

The remaining structure, though safe and structurally stable as a balanced cantilever, causes unease among drivers, unnecessarily fueled by social media. It is subsequently also demolished as well the following weekend .

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20083848
  • Published on:
    27/09/2022
  • Last updated on:
    27/09/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine