0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

East Memorial Shoreway Footbridge

General Information

Completion: 1 November 1952
Status: in use

Project Type

Awards and Distinctions

1952 Honorable Mention  

Location

Location: , , ,
Address: Cleveland Memorial Shoreway
Coordinates: 41° 32' 20.89" N    81° 38' 4.41" W
Show coordinates on a map

Technical Information

Dimensions

main span 62.48 m

Cost

cost of construction United States dollar 125 000

Materials

arches steel

Participants

Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20080836
  • Published on:
    28/03/2021
  • Last updated on:
    28/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine