0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1936
Status: demolished (1969)

Project Type

Structure: Tied-arch bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , ,

Technical Information

Dimensions

total length 142.0 m
main spans 2 x 43.3 m - 55.5 m

Materials

arches steel

Notes

Piers reused for reinforced-concrete deck girder structure at the same site. One arch re-erected as the Clackamas River (Barton) Bridge, in Clackamas County.

Participants

Design

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008529
  • Published on:
    08/03/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine