General Information
Completion: | 2005 |
---|---|
Status: | in use |
Project Type
Structure: |
Swing bridge |
---|---|
Function / usage: |
Road bridge |
Structure: |
Cable-stayed bridge with semi-fan system |
Material: |
Steel bridge |
Structure: |
Two-span cable-stayed bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Goole, East Riding of Yorkshire, Yorkshire and the Humber, England, United Kingdom |
---|---|
Crosses: |
|
Location description: |
Across lower end of Don River (locally "Dutch River") |
Coordinates: | 53° 41' 46.31" N 0° 52' 24.25" W |
Technical Information
Cost
cost of construction | Pound sterling 4 750 000 |
Materials
deck |
steel
|
---|---|
pylons |
steel
|
Notes
Replacement of lowest crossing of section of Don diverted by Netherlands engineer Cornelius Vermuyden in 1627.