General Information
Completion: | 2010 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Box girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 362.5 m | |
main bridge | ||
---|---|---|
main span | 128 m | |
span lengths | 72 m - 128 m - 72 m | |
number of spans | 3 | |
height above valley floor or water | 140 m | |
piers | height | max. 128 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
- About this
data sheet - Structure-ID
20052571 - Published on:
04/02/2010 - Last updated on:
05/02/2016