0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Rheinbrücke Duisburg-Neuenkamp
Beginning of works: 1968
Completion: 16 October 1970
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Rhine River
Carries:
  • Autobahn A40
Part of:
Replaced by: Duisburg-Neuenkamp Bridge (2026)
Coordinates: 51° 26' 13.18" N    6° 42' 44.67" E
Show coordinates on a map

Technical Information

Dimensions

main span 350 m
total length 777.40 m
span lengths 46.76 m - 50.00 m - 2 x 45.00 m - 350 m - 105.00 m - 60.00 m - 75.64 m
number of spans 8
bridge surface 27 800 m²
roadway / carriageway width 2 x 12.50 m
deck deck depth 3.75 m
deck width 35.80 m
number of cells in box section 2
pylon pylon height (above deck) 48.00 m

Cost

cost of construction ca. Euro 37 000 000

Materials

cables steel
deck steel
pylons steel

Chronology

August 2004
— December 2006

Rehabilitation of the bridges including corrosion protection measures for the cables costing roughly 7 million euros.

Participants

Architectural consulting
Initial construction (1968-1971)
Owner
Client
Contractor
Rehabilitation (2004-2006)
Owner
Client
Wind analysis
Structural engineering
Checking engineering
Co-contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20000424
  • Published on:
    18/09/1999
  • Last updated on:
    06/08/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine