0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: 都格北盘江特大桥 (Běipánjiāng Tèdàqiáo)
Beginning of works: 2011
Completion: 10 September 2016
Status: in use

Project Type

Location

Location: , ,
Coordinates: 26° 23' 8.31" N    104° 40' 26.86" E
Show coordinates on a map

Technical Information

Dimensions

main span 720 m
total length 1 340 m
height above valley floor or water 565 m
pylons height max. 269 m

Materials

piers reinforced concrete
pylons reinforced concrete
deck truss steel

Chronology

10 September 2016

Construction of the bridge is completed.

29 December 2016

The bridge is officially opened.

Participants

Structural engineering

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20072454
  • Published on:
    18/01/2017
  • Last updated on:
    09/06/2017