General Information
Completion: | 2030 |
---|---|
Status: | project phase |
Project Type
Function / usage: |
Metro (Subway, Underground) Line |
---|
Location
km | Name |
Technical Information
Dimensions
length | 49 km | |
number of stations | 8 | |
track gauge | 1 435 mm |
Design Loads
operating speed | 110 km/h |
Excerpt from Wikipedia
The Purple Line is a proposed line of the Dubai Metro network in Dubai, United Arab Emirates. The purple line will run between Dubai International Airport to Al Maktoum International Airport, along Al Khail Road. Announced in 2007, construction of the line had not started yet as of February 2023, and news reports in July 2011 claimed that the line faces cancellation.
It will have about eight stations along its route, three with check-in facilities. However The Dubai Airports claimed that this was unfeasible as it did not pass through many localities. However they suggested opting for a "central terminal" similar to ones in the US where trains leave from inside the airport to the other airport with trains also leaving to the city. The RTA have taken this into consideration.
Statistics
The Purple line will be 49 kilometres (30 mi) long and trains on this line will travel at an average speed of 110 kilometres per hour (68 mph).
Text imported from Wikipedia article "Purple Line (Dubai Metro)" and modified on March 26, 2024 according to the CC-BY-SA 4.0 International license.
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
- About this
data sheet - Structure-ID
10001031 - Published on:
08/02/2007 - Last updated on:
23/03/2024