General Information
Project Type
Function / usage: |
Bicycle bridge |
---|---|
Structure: |
Underslung girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Drolshagen, Olpe (Kreis), North Rhine-Westphalia, Germany |
---|---|
Coordinates: | 51° 1' 10.43" N 7° 48' 38.37" E |
Technical Information
Dimensions
width | 3.75 m | |
span | 38.00 m | |
bridge surface | 142.5 m² | |
superstructure | deck depth | 3.00 m |
Quantities
structural steel | 31.5 t | |
concrete volume | 275 m³ | |
reinforcing steel | 26 t | |
shear studs | 0.5 t |
Cost
cost of construction | ca. Euro 763 000 |
Materials
truss |
steel tubes
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Client
Structural engineering
Co-contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Chronik des Brückenbaus. Presented at: 29. Dresdener Brückenbausysmposium, 11./12. März 2019, Dresden (Germany), pp. 197-208. (2019):
- About this
data sheet - Structure-ID
20077200 - Published on:
05/04/2019 - Last updated on:
05/04/2019