0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1906
Completion: 19 July 1909
Status: in use

Project Type

Function / usage: Railroad (railway) tunnel
Structure: Tunnel
Construction method: Tunnel shield

Location

Location: , , ,
, , ,
Underneath of:
  • Hudson River
Part of:
Coordinates: 40° 42' 57.30" N    74° 1' 28.83" W
Show coordinates on a map

Technical Information

Dimensions

length 1 737 m
number of tracks 2 x 1
number of tubes 2
track gauge 1 435 mm

Materials

tubbings steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20023813
  • Published on:
    16/10/2006
  • Last updated on:
    15/12/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine