0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: 동작대교 / 銅雀大橋 (Dongjak daegyo / Tongchak taekyo)
Beginning of works: 18. October 1978
Completion: 14. November 1984
Status: in use

Project Type

Structure: Tied-arch bridge
Material: Steel bridge
Function / usage: Road bridge
Material: Structurae Plus/Pro - Subscribe Now!

Location

Location: ,
Crosses:
  • Han River
Coordinates: 37° 30' 39.11" N    126° 58' 54.65" E
Show coordinates on a map

Technical Information

Dimensions

main span 80 m
total length 1 330 m
deck deck width 40 m

Materials

deck steel
piers reinforced concrete
arches steel
suspenders steel

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20006572
  • Published on:
    06/11/2002
  • Last updated on:
    07/01/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine